No. If the ground disturbance is to take place within a public road allowance, provincial highway right-of-way or utility right-of-way, the ground disturber may be required to obtain an excavation permit or written permission from the utility owners before disturbing the ground. If the ground disturbance is to install new utilities, line assignments may have to be obtained from the authority having jurisdiction over the right-of-way, prior to construction.